Taiwan Space Agency plans rocket R&D center in Tainan
Center scheduled to be completed in 2029
Center scheduled to be completed in 2029
Center scheduled to be completed in 2029
Center scheduled to be completed in 2029
Measure would enable personnel exchanges between NASA and TASA
Measure would enable personnel exchanges between NASA and TASA
Black Kite-1 aims to test communications and assess space-grade tech
Black Kite-1 aims to test communications and assess space-grade tech
Formosat-8 is Taiwan’s 1st domestically built optical remote-sensing satellite constellation
Formosat-8 is Taiwan’s 1st domestically built optical remote-sensing satellite constellation
SpaceX rocket flight was canceled just before takeoff
SpaceX rocket flight was canceled just before takeoff
Base in Pingtung records 11th research rocket launch
Base in Pingtung records 11th research rocket launch
Group of 8 satellites to be fully operational in 2031
Group of 8 satellites to be fully operational in 2031
Satellite to be launched in US as part of low-Earth orbit constellation project
Satellite to be launched in US as part of low-Earth orbit constellation project
15 teams will compete in rocket design, building, and testing
15 teams will compete in rocket design, building, and testing
PARUS-T2 builds on PARUS-T1 design with improved computer, power control system, and satellite battery
PARUS-T2 builds on PARUS-T1 design with improved computer, power control system, and satellite battery